Major Milestone Projects

EPC PROJECTS
 ADNOC Gas Processing -RUWAIS – Train 1 & 2 HP & LP Flares and Common Burn Pits Upgrade.Project No. 5631.Agreement No. PX.16.071 for EPC Work
 ADNOC Gas Processing -RUWAIS – Train 1 & 2 Process, Cooling & Fire Water Pumps Replacement (Phase-1 Cooling Water Pumps Replacement) for EPC Work
 ADNOC Gas Processing -HABSHAN – Habshan Direct Depressurization (Hdd) of Thamama-F Trunklines – EPC Phase
 ADNOC Refining -RUWAIS – Upgrading & Replacement of HVAC/AIR Extraction and Fume Hoods Systems In Laboratory Building at Ruwais Refinery (East)
 ADNOC Gas Processing -PROJECTS PIPELINE – Additional Nitrogen to TAKREER RRD. Project No. 5627 Enquiry No. 13562701 for EPC Work
 ADNOC Gas Processing -HABSHAN – Rich Amine Piping Replacement Habshan-0 Unit 30/31
 ADNOC Gas Processing -HABSHAN – Laydown Condensate Line from Tammama C to replace the old line to ADCO
 ADNOC Gas Processing -ASAB – Enhancement of Existing Water Distribution Facilities AGD-0 Plant (Water Supply to Gasco-Asab)
 ADNOC Refining -ADRD – Replacement of Supply & Return Cooling Water Piping System in Process units, Back Pressure Towers Return Piping and Sea Water Pumping Station Piping Systems at Abu Dhabi Refinery
 ADNOC Refining -ADRD – Additional Equipment and Piping Works at Abu Dhabi Refinery

MAJOR REFURBISHMENT OF JETTY
 ADNOC Gas Processing -RUWAIS – Refurbishment of Jetty Loading Line and Berth-1 Structure.
 ADNOC Gas Processing -RUWAIS – Refurbishment of Old Ship Loader Structure and Jetty – SGP Ruwais
 ADNOC LNG – Refurbishment Works, Strengthening Of Joints And Repair / Replacement Of LNG Jetty Corroded Structural Members

API STORAGE TANKS OVERALL, MAJOR REFURBISHMENT PROCESS
 ADNOC Refining -RUWAIS – Refurbishment and Repair of 24 Tanks in Ruwais Refinery(EAST AND GUP).
 ADNOC Refining -RUWAIS – Internal Cleaning of Jet A1 Tanks No. 41-F-35/36/37 at Ruwais Refinery
 ADNOC Refining -RUWAIS – Refurbishment of 20 Tanks in Oil Movement at Ruwais Refinery.
 ADNOC Gas Processing -RUWAIS – Major Refurbishment and Inspection of Cryogenic Storage Tanks in Ruwais – 2011-2012
 TRANSCO – Major rehabilitation work of Intermediate Reservoir Steel Tank 1 & 2  ( IMR)
 ADNOC LNG – Replacement of Tank Bottom, Internal/External Protection, Blast Cleaning & Painting Works.
 ADNOC Gas Processing -RUWAIS – Refurbishment of Pentane Tanks 6D-151A & 6D-151B in Ruwais Plant
 ADNOC Refining -ADRD – Cleaning & Repair of 9 Tanks at Umm Al Nar Refinery.
 ADNOC Refining -ADRD – Cleaning & Repair of 11 Tanks at Umm Al Nar Refinery.

PIPELINES / PIPING – CONSTRUCTION / REFURBISHMENT PROCESS
 ADNOC Gas Processing -RUWAIS – Refurbishment of C3, C5, FW Lines, BOG Lines and Equipments – 2014 ULCS Programme.
 ADNOC Gas Processing -RUWAIS – Propane & Butane Tanks Piping Refurbishment including Re-insulation – Ruwais
 ADNOC Gas Processing -RUWAIS – HP Flares, S4 Support Refurbishment at Ruwais
 ADNOC Refining -ADRD – Refurbishment of Pipelines at Abu Dhabi Refinery
 ADNOC Gas Processing -RUWAIS – Extension of Multipurpose Line to Butane (C4) Tanks and Re-instatement of Integrity of Butane Rundown Line at Ruwais
ADNOC Refining -Piping Modifications At Ruwais Refinery (EAST) To Supply Gas To Madinat Zayed Terminal Utilizing Existing IRP-I NR Line & IRP-II Gasoil Line)

OUTAGE / SHUTDOWN PROJECTS

 ADNOC Refining -Ruwais – Gasoline and Condensate (2 Trains) Turnarounds 2019 at Ruwais Refinery (East).
 ADNOC Gas Processing -HABSHAN – Rich Amine Piping Replacement Habshan-0 Unit 30/31 – Sole Responsibility.
 ADNOC Gas Processing -RUWAIS – Train-1&2 Shutdown April/ 2016: Internal Inspection & Servicing of Static Equipment – Sole Responsibility.
 ADNOC Gas Processing -RUWAIS – Inspection and Partial Repair of Cooling Water Structures in Train-1, 2 & 3 During 2016 Shutdown at Ruwais. – Sole Responsibility.
 ADNOC Gas Processing -RUWAIS – Train-3 NGL Process Plant Major Shutdown 2016 – Sole Responsibility.
 ADNOC Gas Processing -RUWAIS – SRU Unit 45 & Unit 59 Shutdowns at Ruwais 2015 – Sole Responsibility.
 ADNOC Gas Processing -RUWAIS – Ruwais Shutdown of Train-2 for Periodic Inspection and Maintenance (Jan-2013) – Sole Responsibility.